5 - 62,500 horsepower generating units produce 255 megawatts of power are located on the Arizona side of the river. |
|
|
Huge transformers start the electicity on it's way. |
|
|
The power grid begins the distribution of the electricty. 2,100 miles of high-voltage transmission lines serve 43 power substations in Arizona, Nevada, and California which supplies power to a number of utilities and other entities in this area. |
|
|
The gantry crane is used to service the generators. Note the new park being built in the background. It is part of the new Colorado River Heritage Greenway Trail . |
|
|
This gantry crane moves along the top of the water intakes for service work and to remove any debris that may have gotten into the area. |
|
|
Water delivery system to the generators. |
|
|
The overflow spillway is in the background, the water intakes are on the right. |
|